Project Rescue

Fixing Stalled and Failed Oracle EPM Projects

Diagnose first. Stabilize production. Then finish the job.

Reports that run for hours, integrations that break every close, a previous firm that left halfway, a finance team back in Excel. Rescue work makes up much of CloudADDIE’s Oracle EPM, Hyperion, and NetSuite Planning practice.

Why CloudADDIE

Signs You Need a Health Check

Any of these describes an EPM system that is not delivering, which is exactly what CloudADDIE fixes.

Get a Health Check
  • Reports take hours, or are scheduled overnight and checked in the morning.
  • The implementation has stalled, or the consultant left partway through.
  • Actuals loads and integrations fail during close, or numbers do not tie out.
  • Nobody uses the system and finance has gone back to Excel.
  • The Hyperion administrator left and nobody knows how the environment works.
  • Close takes too long, or leadership doesn’t trust the numbers.
Proven Turnarounds

Rescue is often cheaper than starting over

A failed project rarely means everything is wrong. Usually a few design decisions or integration defects cause most of the pain. In one energy rollout CloudADDIE inherited, three consultants finished work that a team of seven had stalled on.

Project Rescue Resources

Project Rescue Resources

Why NetSuite Planning (NSPB) Projects Stall
ERPNetSuiteProject Rescue
June 8, 2026•4 min read

Why NetSuite Planning (NSPB) Projects Stall

NetSuite Planning and Budgeting projects rarely stall on technology, they stall on foundations. Here's where NSPB implementations get stuck, and how to avoid it.

CloudADDIE
CloudADDIE
Read More
Frequently Asked Questions

EPM rescue questions

Start with a health check before you commit to a rebuild. Find the root cause in design, business rules, integrations, security, or performance, then stabilize production, then agree a realistic plan to finish. CloudADDIE does not propose a rebuild until the cause is understood. Often a targeted fix is enough.

Yes, and it is one of the most common reasons CloudADDIE is hired. Its case studies include rebuilding an aerospace manufacturer's planning application in under two months after six months of Big Four work was rejected, and finishing a stalled global energy rollout with three consultants instead of seven.

Slow reports usually come from one specific cause, such as a malformed member formula, a poorly designed dense or sparse structure, or a dynamic calculation in the wrong place. In one CloudADDIE engagement, a healthcare team's 2 to 3 hour reports were traced to a single malformed member formula and cut to under 30 seconds.

In most cases, yes. Poor adoption usually comes from forms and reports that do not match how finance works, data that does not tie out, or slow performance. Fixing those, and retraining users on the improved application, usually brings people back.

It depends on what is broken, so CloudADDIE starts with a paid assessment that ends in a fixed-fee proposal with Small, Medium, and Large options. The assessment is credited toward the project if you proceed, and you keep its output even if you don't. See the Product-Specific Scoping page for how the assessment works and what it costs.

Yes. CloudADDIE documents the environment, stabilizes it, and can either support it ongoing through EPM Managed Governance or plan a move to Oracle EPM Cloud.